Base price, contract price and separate costs are different.

Building a $400K Home? The Hidden Costs Builders Don't Always Include

Separate the advertised base price, the actual contract price and costs you will pay outside the construction contract.

Follow the $445K example
Watch the source video, then compare the numbers and planning questions below.Watch on YouTube (opens in a new tab)↗

The short answer

A $400,000 advertised base price may not include the lot, upgrades or move-in items you expect. In the video’s hypothetical example, a $15,000 lot premium and $20,000 of upgrades make a $435,000 contract price; $10,000 of separate essentials brings the combined example budget to $445,000. That is not automatically the mortgage amount, cash needed at closing or a complete all-in budget. Confirm each inclusion and cost in writing.

Advertised base priceComplete purchase budget

Start with three different numbers

The advertised base price is a starting description for a floor plan and its stated features. The contract price includes the selections and charges actually written into your purchase agreement. Separate costs are items you pay outside that price.

Ask the builder to identify those categories before comparing homes. The model’s appearance does not by itself establish what your contract includes, and the advertised price is not a complete mortgage or moving budget.

Advertised baseThe stated floor plan, lot assumption and features
Contract priceWhat your written selections and agreement include
Separate expensesItems paid outside that purchase price
None of these numbers alone is the mortgage amount or cash required at closing.

Lot premiums can change the contract price first

Some builders charge more for particular lots, such as a larger site or a preferred location. Whether a premium applies, and what it includes, depends on the written offer for the actual property.

In the source example, a $400,000 base price plus a $15,000 lot premium becomes $415,000 before interior upgrades. That is a hypothetical charge, not a typical fee or a promise about the lot you choose.

Check location-specific considerations as well as the price. Ask what the lot selection commits you to, what due dates apply and what the contract says if you later want a different selection.

  1. Base price$400,000
  2. Lot premium+ $15,000
  3. Before interior upgrades$415,000
Hypothetical lot premium; actual charges and terms vary.

Model-home finishes may be optional selections

Request a written list of standard flooring, cabinets, counters, lighting, appliances and other features. Identify which model-home items are included and which require an upgrade charge.

The video adds $20,000 of selected upgrades to the $415,000 example, producing a $435,000 contract price. An upgrade allowance is not necessarily enough to cover every selection, and changing choices can change the price or schedule.

Ask for itemized prices and the change-order rules before authorizing work. Money spent on upgrades does not guarantee the same increase in market value or an appraisal high enough to support the full price.

  1. Base plus lot$415,000
  2. Design upgrades+ $20,000
  3. Hypothetical contract$435,000
Selections and allowances must be confirmed in the actual agreement.

Landscaping and move-in essentials may be separate

Confirm what is included outside as well as inside: yard work, fencing, irrigation, window coverings and other essentials can vary by builder and community.

The source sets aside another $10,000 for landscaping, window coverings and other move-in items outside the hypothetical $435,000 contract. The combined example is then $445,000.

Do not assume those separate expenses can all be financed in the mortgage or paid with a builder credit. Check how each will be paid and when it is due, including items needed soon after you receive the keys.

  1. Contract example$435,000
  2. Separate essentials allowance+ $10,000
  3. Selected combined budget$445,000
Not all separate items can be financed or paid at closing. Other expenses are still excluded.

Read the $445,000 comparison as a budget example

The arithmetic is $400,000 base price plus $15,000 lot premium plus $20,000 upgrades, giving a $435,000 contract price. Add $10,000 of separate essentials to reach $445,000 in the selected combined expenses.

The difference from $400,000 is $45,000, or 11.25% of the original base. Only $35,000 of that increase is inside the assumed contract price; the other $10,000 is a separate allowance.

The $445,000 is not a loan balance or the amount due at closing. It also does not include every possible cost. Financing, closing, moving, utilities, maintenance and other items may still need separate estimates.

The $45,000 difference is 11.25% of the $400,000 base. Additional financing, closing, moving and other costs may remain.
ItemAmountBudget bucket
Advertised base$400,000Contract
Lot premium+ $15,000Contract
Selected upgrades+ $20,000Contract
Contract subtotal$435,000Purchase price in this example
Separate essentials+ $10,000Outside the contract
Selected combined expenses$445,000Not mortgage amount or cash to close

A builder financing incentive is not a price cut by itself

The video describes a possible $10,000 incentive for eligible closing costs when using a preferred lender. Such an offer can have value, but the written conditions, loan-program limits and actual eligible costs control its use.

Do not automatically subtract an advertised credit from the contract price or assume unused funds are cash you can take home. A credit, a permanent rate reduction, a temporary payment subsidy and a negotiated price reduction can produce different results.

Compare written Loan Estimates using comparable loan terms. Check the interest rate and annual percentage rate, or APR, which includes interest and certain borrowing charges. Review points—the upfront charges for the quoted rate—other fees, the full payment and money you still need at closing. A preferred-lender incentive alone does not establish the least expensive financing.

What kind of builder benefit is being offered?

Eligible credit

Pays only permitted costs under actual limits and offer terms.

Rate or payment benefit

Has an actual price, structure and payment schedule to compare.

Price reduction

Changes the purchase price only when negotiated into the agreement.

Do not treat a headline incentive as unrestricted cash or automatically subtract it from the price.

Add costs outside the selected example without counting twice

Ask about inspections, moving, utility connections, association charges, possible tax changes and closing costs. Some may be due before closing, some at settlement and some after moving.

For each item, identify whether it is already in the contract or in the $10,000 essentials allowance. Add it only if it is outside the amounts already counted. Do the same for taxes and insurance included in an estimated mortgage payment.

If you are arranging a construction loan rather than purchasing a completed builder home, ask about draw charges, interest during construction and any permanent-loan conversion costs. Do not assume the same financing structure applies to every new home.

Ask for an itemized written plan before signing

Request the selected lot, standard features, upgrade prices, allowances, construction timeline, deposit terms and estimated closing costs. Mark which expenses are included in the purchase price and which you will pay separately.

Compare payment dates with your available cash. Review how a delay or selection change could affect temporary housing, a rate lock, the closing date and other commitments.

Ask the appropriate professionals about unclear contract terms before you sign. The goal is not to assume every builder leaves out the same things; it is to know what this builder and this agreement actually include.

Use the actual builder, property, agreement and financing offer.
ConfirmWhy it matters
Inclusions and selectionsKnow the actual contract price
Separate essentials and chargesPlan the cash outside the contract
Loan and incentive termsCompare usable value and full borrowing costs
Timeline and due datesBudget for delays and cash timing

Five questions before you commit to the builder contract

  1. What exact lot and standard features does the advertised base price include?

  2. Which premiums, selections or change orders increase my actual contract price?

  3. Which move-in essentials are separate, how will I pay them and when are they due?

  4. What are the real conditions and usable value of any lender or builder incentive?

  5. What complete budget, cash-to-close estimate and backup plan account for costs or timing outside the contract?

Sources and example notes

The video’s complete narration and example table establish the figures: $400,000 base, $15,000 lot, $20,000 upgrades and $10,000 separate essentials. The combined $445,000 is an illustration, not a price quote or full financing budget.

Inclusions, contractor charges, incentives, loan eligibility, deposits and payment timing vary. No amount is automatically financed or covered by a credit, and no sale price or approval is guaranteed. Verify the actual written agreement and loan terms.

Troy Schuricht is Your Homebuyer Coach, NMLS #262655. NextGen Financial Services NMLS #1686419.

Questions buyers ask

Is the advertised $400,000 always the contract price?

No. It may be a base price for stated features and a particular lot assumption. Actual selected premiums and upgrades can change the written contract price.

Is the $445,000 example the mortgage amount?

No. It combines a hypothetical $435,000 contract price with $10,000 of separate essentials. The mortgage depends on financing terms, down payment, accepted value and permitted financed costs.

What does the 11.25% increase measure?

It is the example’s $45,000 selected-cost difference divided by the original $400,000 base price. It is not a standard builder markup or an estimate of every additional cost.

Can I assume model-home features are included?

No. Get a written list of standard features and priced upgrades for the home and lot you are buying. An appearance in the model does not replace contract inclusions.

Does a $10,000 closing incentive reduce the house price by $10,000?

Not by itself. Eligible closing credit and a negotiated price reduction are different. Written terms, program limits and actual eligible costs determine the credit’s usable value.

Have I covered everything by reaching the $445,000 example?

No. The example is limited to its listed items. Add other applicable financing, closing, moving and household costs only after checking what is already included so you do not count expenses twice.

Your next step

Get personalized guidance

Bring your actual budget, loan documents and plans. Ask for current written terms before committing money.